| | Prervation timeline. Click on linked projects for more information - 1977 New cedar-shake roof Iron fence restoration
- 1985 Preservation guide Siding repair
- 1986 Fire detection system
- 1987 Chimney removal, flashing repair New hand-crafted door - east side Electric upgrade Stone wall restoration
- 1988 Sill, stud, & end-post restoration; cemetery fence restoration
- 1989 Wood gutters reconstruction, interior framing stabilization
- 1992 Interior stair stabilization, tred and riser restoration; ground radar cemetery survey and tombstone repair; encapsulation of asbestos roof insulation
- 1993 Window reglazing, cemetery photographed
- 1995 Gallery cover construction & installation
- 1998 Window shutter restoration, floor joist repair; plaster restoration, loft rehabilitation
- 2007 Complete stripping Meeting House, stip and restore Annex
|