- 1977
New cedar-shake roof Iron fence restoration
- 1985 Preservation guide
Siding repair
- 1986 Fire detection system
- 1987 Chimney removal, flashing
repair New hand-crafted door - east side Electric upgrade Stone wall
restoration
- 1988 Sill, stud, & end-post restoration; cemetery fence
restoration
- 1989 Wood gutters reconstruction, interior framing stabilization
- 1992 Interior stair stabilization, tred and riser restoration;
ground radar cemetery survey and tombstone repair; encapsulation of
asbestos roof insulation
- 1993 Window reglazing, cemetery photographed
- 1995 Gallery
cover construction & installation
- 1998 Window shutter restoration,
floor joist repair; plaster restoration, loft rehabilitation
- 2007 Complete stripping Meeting House, stip and restore Annex
- 2020 Remove Norway spruce
|